| Authors |
Co-authors |
Country |
Title |
No |
Subject |
Session |
| Skibniewski, Miroslaw |
|
USA |
*New directions and developments in robotics and site automation in the U.S.A. |
K1 |
|
Keynote1 |
|
| Hasegawa, Yukio |
|
Japan |
*A new wave of construction automation and robotics in Japan |
K2 |
|
Keynote2 |
|
| Balaguer, Carlos |
|
Spain |
*Open issues and future possibilities in the EU construction automation |
K3 |
|
Keynote3 |
|
| Adeli, Hojjat |
|
USA |
*Emerging information and computing technologies for construction automation |
K4 |
IT |
Keynote4_MD3 |
|
| Wing, Robert |
|
UK |
*Factory housing - making the connections |
K5 |
Automation |
Keynote5_MB3 |
|
| Liao, Ching-Lung |
|
Taiwan |
*How to Establish Environment in Construction-An Illustration of TaiwanHigh Speed Rail Project |
K6 |
|
Keynote6 |
|
| Ing, Nita |
|
Taiwan |
*Opportunities and challenges in the implementation of Taiwan high speed rail project: a private sector perspective |
K7 |
|
Keynote7 |
|
| Kim, Hyoungkwan |
Carl T. Haas, Alan F. Rauch, Craig Browne |
USA |
Innovative testing system of construction aggregate using laser profiling |
30 |
Automation |
MA3 |
|
| Trueman, Eric |
|
Australia |
Factors influencing the production of high quality aggregates for the civil construction industry and the essential need for crusher automation |
70 |
Automation |
MA3 |
|
| Gyawali, Tek Raj |
Kazuie Yamada, Matabee K. Maeda |
Japan |
High productivity continuous concrete mixing system |
76 |
Automation |
MA3 |
|
| Bock, Thomas |
Serguei Voltchkov |
Germany |
Methodological analysis of automation and robotization for the process of placing and consolidation of a concrete mixture |
80 |
Automation |
MA3 |
|
| Baba, Misao |
Mitsuo Takeda, Takashi Nogiwa |
Japan |
Development of auto-conveying system for dam concrete |
84 |
Automation |
MA3 |
|
| Lin, Lee-Kuo |
|
Taiwan |
The research of automatic concrete placing |
177 |
Automation |
MA3 |
|
| Wu, Chi-Hsing |
Jiung-Yuan Wang |
Taiwan |
The behavior of ultrasonic waves propagating in concrete using the ultrasonic-pulse methods to measure the depths of cracks in concrete |
204 |
Automation |
MA3 |
|
| Chen, Po-Han |
Yuh-Chin Chang, Luh-Maan Chang |
USA |
Steel bridge rust identification using multi-resolution pattern classification |
112 |
Automation |
MA4 |
|
| Hossain, K. M. Anwar |
|
Papua New Guinea |
Application of expert system for bridge management in Papua New Guinea |
127 |
Automation |
MA4 |
|
| Chen, Chien-Chou |
Hui-Hsiung Chuang, Ming-Chia Ko, Tung-Hung Tsai |
Taiwan |
The systematic construction method of Kao Ping His cable-stayed bridge |
131 |
Automation |
MA4 |
|
| Fang, Shoei-Lian |
Thay-Ming Lee, Pin-Song Lin |
Taiwan |
Automatic management of the widening project of the Chungshan freeway |
168 |
Automation |
MA4 |
|
| Li, Yeou-Fong |
Shang-Hsien Hsieh, Chi-Chang Chan |
Taiwan |
A planning multi-level bridge management system for taiwan |
169 |
Automation |
MA4 |
|
| Haas, Carl T. |
Christine Alemany, HyoungKwan Kim |
USA |
Study of foreman-level task automation in the US construction industry |
18 |
Automation |
MB3 |
|
| Kaneta, Takashi |
Toshimasa Okuma, Kenji Kimoto, Ichiro Nakaoka, Shuzo Furusaka, Jea Sauk Lee |
Japan |
Accountability of Japanese construction industry |
27 |
Automation |
MB3 |
|
| Kim, Sung-Keun |
Kyo-Jin Koo, Jeffrey S. Russell |
USA |
Agent-Based Approach for Intelligent Automated Landfill Operation System |
31 |
Automation |
MB3 |
|
| Uwland, Jan J. |
Rob Suers, Peer Goudswaard |
The Netherlands |
Integration of measurement systems by using GPS |
102 |
Automation |
MB3 |
|
| O'Connor, James |
Shane P. Hadeed, Kristen E. Braden, Mandar Deogaonkar |
USA |
Benchmarking the U.S. Industry's Use of Automation and Integration Technologies on Projects |
50 |
Automation |
MB4 |
|
| Taylor, Mark |
S. C. Wamuziri, I. G. N. Smith |
UK |
Analysis of risk in construction automation investment |
65 |
Automation |
MB4 |
|
| Gregory, Rita A. |
Terrance Ward |
USA |
Work force characteristics in a robot driven construction industry |
74 |
Automation |
MB4 |
|
| Wako, Kazuo |
Takehiko Iizuka |
Japan |
Environmental care execution operation of GRB System |
82 |
Automation |
MB4 |
|
| Bock, Thomas |
Frank O. Prochiner |
Germany |
Home 24 - 24 hours to build a house |
105 |
Automation |
MB4 |
|
| Ikeda, Hiroyasu |
Noboru Sugimoto, Tsuyoshi Saito, Masanori Onishi |
Japan |
Safety control mechanism for construction working robots in collaboration with human workers |
110 |
Automation |
MB4 |
|
| Lai, Yu-Ting |
Wei-Chih Wang |
Taiwan |
Automatic representation of construction interfaces |
199 |
Automation |
MB4 |
|
| Tsai, Tsung-Chieh |
Shuzo Furusaka, Takashi Kaneta |
Japan |
Evaluating project risks of project delivery systems in construction projects |
71 |
Hazard |
MC3 |
|
| Chen, Tsung-Hsien |
Ban-Jwu Shih |
Taiwan |
The technological innovations of the disaster command center based on the experience of the Ji-Ji earthquake |
133 |
Hazard |
MC3 |
|
| Yu, Wen-der |
Shih-Chung Huang, Shih-Hsin Zeng |
Taiwan |
The application of geographical information system on disaster management and mitigation |
138 |
Hazard |
MC3 |
|
| Cheng, Yi-Meng |
Tsung-Min Cheng, Cho-fu Wu, Shih-shiuh Wang |
Taiwan |
Facility risk management of common conduits |
139 |
Hazard |
MC3 |
|
| Peng, J. L. |
I. M. Shih |
Taiwan |
Safety performance of one-layer shoring systems used in construction |
182 |
Hazard |
MC3 |
|
| Shih, Ban-jwu |
|
Taiwan |
The disaster mitigation and management strategy for bridges |
185 |
Hazard |
MC3 |
|
| Seward, Derek W. |
Khaled Zied, John Rhiel, Anthony Dolman |
UK |
The development of a robotic system for tool deployment in hazardous environments |
124 |
Hazard |
MC4 |
|
| Huang, Shih-Chung |
Tsung-Min Cheng, Shih-Hsin Zeng |
Taiwan |
Monitoring and supporting system for hazard mitigation |
155 |
Hazard |
MC4 |
|
| Lin, Lee-kuo |
Chen-You Jian, Jinn-Ting Huang |
Taiwan |
Automatic hazard inspection management system of RC building |
178 |
Hazard |
MC4 |
|
| May, Ming-Der |
|
Taiwan |
Applying genetic algorithm on selecting emergent medical station before disasters |
180 |
Hazard |
MC4 |
|
| Shih, Naai-Jung |
|
Taiwan |
An application of virtual reality formats in managing visual information of earthquake damaged sites |
186 |
Hazard |
MC4 |
|
| Su, Chin-En |
Ban-Jwu Shih, Kai-Wen Luo |
Taiwan |
Study of emergency communication system |
189 |
Hazard |
MC4 |
|
| Ting, Seng Kiong |
F. Wang |
Singapore |
Alternate strategies in the use of information technology in the construction industry of different countries |
67 |
IT |
MD3 |
|
| Che Wan Putra, Che Wan Fadhil |
Mustafa Alshawi |
Malaysia |
Integrating design and construction: a new approach |
118 |
IT |
MD3 |
|
| Li, Ming-Cong |
, Yu-Ting Lai, Shu-Pin Chang, Yu-Lin Huang, Wei-Chih Wang |
Taiwan |
Simulation of structural steel erection operations - a case study |
197 |
IT |
MD3 |
|
| Liao, Kwo-Jen |
|
Taiwan |
The integrated construction management information system application for construction supervision projects |
215 |
IT |
MD3 |
|
| Kano, Naruo |
|
Japan |
Computer-aided planning in construction evaluations of alternatives in construction planning |
28 |
IT |
MD4 |
|
| Wong, Conrad |
Heng Li |
Hong Kong |
*VHBuild:Transferring Project Management into Knowledge Management |
129 |
IT |
MD4 |
|
| Dzeng, Ren-Jye |
Hsin-Yun Lee |
Taiwan |
Automated schedule advisory system |
145 |
IT |
MD4 |
|
| Lin, Kuo-Liang |
Kuei-Yen Chen |
Taiwan |
A computerized substructure construction planning approach |
176 |
IT |
MD4 |
|
| Shou, Keh-Jian |
Chia-Tsung Wu |
Taiwan |
Application of image analysis on tunnelling in gravel formations |
188 |
IT |
MD4 |
|
| Wang, I-Te |
Sung-Mau Lin , Jing-Wen Chen |
Taiwan |
3D-optical deformation measurement and its automation application in tunneling |
192 |
IT |
MD4 |
|
| Chen, Relon J. T. |
Tzu-Wei Wang, Kuan-Yung Chang, Sy Chang |
Taiwan |
Taiwan trackwork development - nonballast track system |
132 |
High-speed rail |
ME3 |
|
| Chiang, Yao-Chung |
Kuo-Hsiung Cheng, Sy Chang |
Taiwan |
Global non-ballasted rail fastener development base on Taiwan experience |
140 |
High-speed rail |
ME3 |
|
| Hsu, Chun Sheng |
Roger L. Sun, Konrad S. T. Tzeng |
Taiwan |
Development of computerized maintenance management system for rail transportation system |
217 |
High-speed rail |
ME3 |
|
| Wei, Zhang |
Der-Cherng Tang, Richard N. Hwang, I-Chou Hu, Fuh Gwo Wang |
Taiwan |
Application of integrated programme/resource management systems for major construction projects |
225 |
High-speed rail |
ME3 |
|
| Wang, Gwan-Shyong |
Jenn-Chuan Chern |
Taiwan |
Information system for the safety of construction of rapid transit systems |
226 |
High-speed rail |
ME3 |
|
| Chang, P.Y. |
C.J. Chang, Martin W. Pei |
Taiwan |
GPS Application on Huge Construction Project- A Feasibility Investigation for Taipei MRT long-term network |
227 |
High-speed rail |
ME3 |
|
| Kim, Sung-Il |
Young-Nam Lee, In-Sup Kim, Won-Pyo Lee |
Korea |
Automation of bridge construction by precast span method in korea high speed railway project |
128 |
High-speed rail |
ME4 |
|
| Chiu, Sou-Laung |
Wen-Bin Kang, Pi-Chu Chiu, Jerry Chou |
Taiwan |
Insights of FPLM for long-viaduct construction in Taiwan high-speed railway project: overcoming the interfaces |
142 |
High-speed rail |
ME4 |
|
| Shing, Chi-Lyang |
Yu-Min You |
Taiwan |
Evaluating high-speed rail system in BOT scheme by economic status in Taiwan ROC |
187 |
High-speed rail |
ME4 |
|
| Kuo, Cheng-Dao |
Wen-Chia Wu, Jiunn-Jyi Chen, Cheng-Yu Chang |
Taiwan |
Automatic supervision and management of construction schedule for BOT project |
216 |
High-speed rail |
ME4 |
|
| Liao, Ching-Lung |
Jenn-Chuan Chern |
Taiwan |
Automatic construction site management with aerial and close range photogrammetry |
224 |
High-speed rail |
ME4 |
|
| Belohoubek, Pavel |
Zdenek Kolibal |
Czech Republic |
Expert system for special construction robots development |
5 |
Automation |
TA1 |
|
| Mitrovic, Ratko |
|
Yugoslavia |
Influence Flexibility Technologies Construction on Process Indutrialization and Robotics in Construction |
42 |
Automation |
TA1 |
|
| Nishimura, Jun |
Takahiro Azuchi, Humio Aita, Hideo Kobayashi, Hajime Nomura |
Japan |
Navi-system: automated survey system for marking work in construction site |
49 |
Automation |
TA1 |
|
| Peyret, Francois |
|
FRANCE |
The achievements of the "computer integrated road construction" project |
55 |
Automation |
TA1 |
|
| Bock, Thomas |
Serguei Voltchkov |
Germany |
Automated control systems for on-site concrete distribution by robotic manipulators |
81 |
Automation |
TA1 |
|
| Wang, Wei-Chih |
Ya-Ling Chiu |
Taiwan |
Logic-based approach for evaluating change impacts |
212 |
Automation |
TA1 |
|
| Jaselskis, Edward J. |
Tarek El-Misalami |
USA |
Radio frequency identification application for constructors |
26 |
Automation |
TA2 |
|
| Ho, Shih-Ping |
Liang Y. Liu |
USA |
Valuation and strategies for investment on automation and robotics |
21 |
Automation |
TA2 |
|
| Ibrahim, Fuziah |
|
Malaysia |
Man and the work environment |
24 |
Automation |
TA2 |
|
| Tran, Thai Dang |
Tatsuro Muro |
Japan |
Automatic control system of the eccentricity of gravity for optimum turning performance of a tracked vehicle on soft terrain |
69 |
Automation |
TA2 |
|
| Stewart, Rodney |
Sherif Mohamed |
Australia |
Selecting technology projects based on an information economics approach: a step towards integrating innovation into business strategy |
90 |
Automation |
TA2 |
|
| Nagano, Yoshiyuki |
Toru Kurenuma, Hideto Ishibashi, Akira Hashimoto |
Japan |
Development of automatic loading system for crushed stone industry |
101 |
Automation |
TA2 |
|
| Pace, Conrad J. |
Derek W. Seward |
UK |
An approach to safety for a robotic excavator |
123 |
Automation |
TA2 |
|
| Abraham, Dulcy M. |
Myung-Jin Chae |
USA |
Utilizing neural networks for condition assessment of sanitary sewer infrastructure |
2 |
Automation |
TA3 |
|
| Arad, Susana |
Victor Arad, Dana Cosma |
Romania |
The systemic analysis of the instability phenomenon of the mining constructions in the coal mining exploitation Jiu Valley-Romania |
3 |
Automation |
TA3 |
|
| Gokhale, Sanjiv |
Makarand Hastak, Rong-Yau Hwang |
USA |
Automated assessment technologies for renewal of underground pipeline infrastructure |
17 |
Automation |
TA3 |
|
| Sivakumar, PL. |
Koshy Varghese, N. Ramesh Babu |
India |
Path planning of cooperative construction manipulators using genetic algorithms |
72 |
Automation |
TA3 |
|
| LaBelle, Diana |
John Bares, Illah Nourbakhsh |
USA |
Material Classification By Drilling |
91 |
Automation |
TA3 |
|
| Hsieh, Chiwan |
Tsung-Shen Liao, Tom Iseley, Hiromasa Shima, Ming-Wen Hsieh |
Taiwan |
Optical technology for pipeline condition assessment |
151 |
Automation |
TA3 |
|
| Hsieh, Ting-ya |
Aviad Shapira, Ming-chang Wu |
Taiwan |
Applying radio direction finding system for improvement of horizontal directional drilling method |
213 |
Automation |
TA3 |
|
| Budny, Eugeniusz |
Witold Gutkowski |
Poland |
A hydraulic open loop system for controlled excavation along prescribed path |
7 |
Automation |
TB1 |
|
| Kiwamu, Nisita |
Motoaki Itou, Satoshi Miyaki |
Japan |
Development & application of column-field-welding robot |
32 |
Automation |
TB1 |
|
| Feldmann, Klaus |
Markus Koch |
Germany |
Development of an open and modular control system for autonomous mobile building robots with flexible manipulators |
34 |
Automation |
TB1 |
|
| Malaguti, Fiorenzo |
|
Italy |
Force sensor for construction machines by they hydraulic driving cylinders |
40 |
Automation |
TB1 |
|
| Muro, Tatsuro |
Dang Thai Tran |
Japan |
Automatic control system of the degree of compaction of a high lifted decomposed granite soil for a vertically vibrating and jumping tracked vehicle |
45 |
Automation |
TB1 |
|
| Dindorf, Ryszard |
|
Poland |
Position modelling of planar two°Vlink manipulator with electrohydraulic control system |
58 |
Automation |
TB1 |
|
| Sooraksa, Pitikhate |
U. Sritheerawirojana |
Thailand |
A bicycle robot: part 1 modeling and control |
62 |
Automation |
TB1 |
|
| Bock, Thomas |
Jens Herbst |
Germany |
Planning aids for enhancing the implementation of a mobile robot on the construction site |
6 |
Automation |
TB2 |
|
| Poppy, Wolfgang |
Erik Unger |
Germany |
Canopen for mobile construction machines - an open communication network for control and automation |
57 |
Automation |
TB2 |
|
| Sooraksa, Pitikhate |
|
Thailand |
Phonon mechanisms: a know - why for vibration in flexible-link robot arms |
61 |
Automation |
TB2 |
|
| Sooraksa, Pitikhate |
T. Uthairat, S. Kaopratum, U. Sritheerawirojana, V. Monyakul |
Thailand |
A bicycle robot: part 2 system implementation |
63 |
Automation |
TB2 |
|
| Wiriyathornphan, Somchai. |
Sooraksa, Pitikhate |
Thailand |
Vibration suppression of a two-link flexible manipulator |
75 |
Automation |
TB2 |
|
| Yeo, Song-Huat |
I-Ming Chen, R S Senanayake, Peng Sin Wong |
Singapore |
Design and development of a planar inchworm robot |
77 |
Automation |
TB2 |
|
| Sooraksa, Pitikhate |
Kangwan Saensawasd, Sorapon Bunjongsena Na Ayuttaya |
Thailand |
Integration of rule based and sensor based control for a six-legged insect-like robot |
60 |
Automation |
TB3 |
|
| Wu, Huapeng |
Heikki Handroos, Juha Kilkki |
Finland |
On the design of a large scale redundant parallel manipulator |
86 |
Automation |
TB3 |
|
| Aracil, Rafael |
Miguel Almonacid, Roque J. Saltaren, Jose Ma Sabater, Jose Ma Azorin |
Spain |
Kinematic control for navigation of mobile parallel robots applied to large structures |
113 |
Automation |
TB3 |
|
| Santos, M. |
Q. P. Ha , D. C. Rye, H. F. Durrant-Whyte |
Australia |
Global control for robotic excavation using fuzzy logic and statecharts |
115 |
Automation |
TB3 |
|
| Pires, J. Norberto |
|
Portugal |
Using actual industrial robot manipulators with construction tasks |
120 |
Automation |
TB3 |
|
| Eguchi, Tadaomi |
Tatsuro Muro |
Japan |
A control system of the tire inflation pressure for running of a wheel system vehicle on soft terrain |
121 |
Automation |
TB3 |
|
| Yamazaki, Fumio |
Yoshihisa Shimizu |
Japan |
*Super dense real-time monitoring of earthquakes for a city gas network in Japan |
117 |
Hazard |
TC1 |
|
| Cheng, Min-Yuan |
Amos Chien-Ho Ko |
Taiwan |
Computer-aided decision support system for disaster prevention of hillside residents |
161 |
Hazard |
TC1 |
|
| Lin, Cheng-Ping |
|
Taiwan |
A total solution for disaster prevention in the internet age |
174 |
Hazard |
TC1 |
|
| Sheu, Lih-Ren |
Ban-Jwu Shih, and Chuan-Wei Wu |
Taiwan |
The search and rescue operation in collapsed buildings caused by earthquakes - a case study |
183 |
Hazard |
TC1 |
|
| Wang, Lung-Chuang |
|
Taiwan |
Study on urban rail rapid transit accidents prevention and hazards identification |
194 |
Hazard |
TC1 |
|
| Yeh, Chunshing |
|
Taiwan |
Fire prevention strategy for buildings in construction |
208 |
Hazard |
TC1 |
|
| Chang, Shu-Chuan |
Yi-Chih Chen, Kuan-Yung Chang, Walter Chen |
Taiwan |
Worker hazard management of building demotition |
134 |
Hazard |
TC2 |
|
| Chen, Chung-Wei |
Hong-Ruey Hwang, Walter Chen, Kuan-Yung Chang |
Taiwan |
Emergency roadworks and suggestions to improve the occupational safety after the Ji-Ji earthquake |
158 |
Hazard |
TC2 |
|
| Lai, Wen-chi |
Yen-Chiu Liu, Ming-Lang Huang, Ching-Weei Lin, Chjeng-Lun Shieh |
Taiwan |
The Characteristics of Surface Ruptures and Landslides in the Chi-Chi Earthquake of September 21th, 1999 |
164 |
Hazard |
TC2 |
|
| Lin, Cheng-Ping |
|
Taiwan |
Observation and assessment of failure reasons of earthquake damage to buildings |
173 |
Hazard |
TC2 |
|
| Lin, Meei-Ling |
Yen-Hsu Lu |
Taiwan |
Construction of GIS and database for debris flow potential study of Chen-You-Lan river watershed |
179 |
Hazard |
TC2 |
|
| Tsai, Jiin-Song |
Lee-Der Jou, Fu-Chen Liu |
Taiwan |
Demolition of abandoned basement in congested urban area |
190 |
Hazard |
TC2 |
|
| Chen, Hong Long |
Wei-Tong Chen |
USA |
An interactive cost-schedule/payment-schedule integration model for cash flow forecasting and controlling |
10 |
IT |
TD1 |
|
| Leiringer, Roine |
|
Sweden |
Integrating the efforts of off-site production with on-site construction |
37 |
IT |
TD1 |
|
| Maruyama, Yoshio |
Junichi Yagi, Hiroo Takada, Kinya Tamaki |
Japan |
Development of virtual and real-field construction management system for innovative, intelligent field factory-development of virtual construction field- |
41 |
IT |
TD1 |
|
| Navon, Ronie |
Aviad Shapira |
Israel |
Automated rebar constructibility problems diagnosis: a concept-proving prototype |
48 |
IT |
TD1 |
|
| Cheok, Geraldine S. |
William C. Stone, Robert R. Lipman, Christopher Witzgall, Javier Bernal |
USA |
Field demonstration of laser scanning for excavation measurement |
79 |
IT |
TD1 |
|
| Kuo, Chin-Chih |
Ren-Jye Dzeng |
Taiwan |
Optimum construction resource in space, time and cost |
162 |
IT |
TD1 |
|
| Knutson, Kraig |
Cliff Schexnayder, Javier Fente |
USA |
Formulation of a £]eta probability distribution function for construction process
control |
59 |
IT |
TD2 |
|
| Tseng, Kevin Kuang-Hui |
Ping Lu |
Singapore |
Construction of Three-Dimensional Models for Structural Objects from Tomographic Images |
126 |
IT |
TD2 |
|
| Liao, Tsung-Shen |
Chih-Ming Huang |
Taiwan |
Electronization of government procurement system - tendering via internet |
172 |
IT |
TD2 |
|
| Pan, Nai-Hsin |
Wen-Zon Chang |
Taiwan |
A study of GIS based decision support system on prioritizing yearly planning of drainage engineering in taichung county |
181 |
IT |
TD2 |
|
| Shiau, Yan-Chyuan |
Kun-Chung Wu |
Taiwan |
The application of computer in construction contract management automation |
184 |
IT |
TD2 |
|
| Lin, Pao H. |
H. Ping Tserng |
Taiwan |
XML/EDI construction project controlling system based on risk mitigation approach |
222 |
IT |
TD2 |
|
| Doloi, Hemanta Kumar |
Ali Jaafari |
Australia |
Application of simulation tool for strategic decision evaluation in life cycle project management |
13 |
IT |
TD3 |
|
| R.Jardim-Goncalves |
R. Tavares, A. Grilo, A. Steigor-Garcao |
Portugal |
A framework for integration of supply chain management applications based on the IAI/IFC model |
83 |
IT |
TD3 |
|
| Weng, Ray |
Luh-Maan Chang, Larry Chen |
USA |
Xml application in aec industry |
95 |
IT |
TD3 |
|
| Tsung-Heng Liu |
Shang-Hsien Hsieh, Yie-Ting Chen, Choung-Houng Wu |
Taiwan |
PIAS: A citis-based information sharing system |
152 |
IT |
TD3 |
|
| Fan, Su-Ling |
M.T. Wang |
Taiwan |
Object-oriented construction scheduling |
196 |
IT |
TD3 |
|
| Yang, Chung-Ham |
Yen-Hui Hsu, Chia-Li Lin |
Taiwan |
Site engineer digital assistant-----the integration of information technology in order to assist site engineers in processing information at all times and places |
229 |
IT |
TD3 |
|
| Chao, Li-Chung |
Min Liu |
Singapore |
Fuzzy neural network model for mark-up estimation |
39 |
IT |
TE1 |
|
| Wanous, Mohammed |
A. H. Boussabaine, J. Lewis |
UK |
A neural networks decision-support system for bidding in construction |
73 |
IT |
TE1 |
|
| Hung, Shih-Lin |
C. C. Jan |
Taiwan |
Augmented integrated fuzzy neural network learning model in structural engineering |
156 |
IT |
TE1 |
|
| Wen, Kuo-Chung |
Hsiung-Leng Chen |
Taiwan |
A study of computer aided layout design in Taipei primary school by hierarchical artificial neural network approach |
202 |
IT |
TE1 |
|
| Yang, Ping-Tsang |
Shu-Ling Lu |
Taiwan |
The automatic layout model in the sequencing of construction activities of multi-objective diaphragm wall unit by using self-learning neural network |
207 |
IT |
TE1 |
|
| Wu, Tao-Sheng |
Ming-Teh Wang |
Taiwan |
A bidding model combined game theory and ai paradigms |
228 |
IT |
TE1 |
|
| Caballero, Amaury A. |
Jose D. Mitrani |
USA |
Fuzzy logic methodology for the comparison of construction firms |
8 |
IT |
TE2 |
|
| Furusaka, Shuzo |
Tomoyuki Taira, Masayuki Matsumoto |
Japan |
Case study on a building construction project carried out using a "cooperative ventures" approach |
15 |
IT |
TE2 |
|
| Kim, Young-Suk |
Se-Wook Oh, Jung-Ryul Kim, Beak-Joon Sung |
Korea |
The Development of an Automated Cost Estimating System Using 3D CAD and Relational Database |
99 |
IT |
TE2 |
|
| Wen, Kuo-Chung |
|
Taiwan |
A study of automatic layout design by genetic algorithm approach |
201 |
IT |
TE2 |
|
| Yang, Ping-Tsang |
Shu-Ling Lu |
Taiwan |
The study of using self-learning neural network in automatic construction site facility layout |
206 |
IT |
TE2 |
|
| Yu, Wen-der |
Miroslaw J. Skibniewski |
Taiwan |
Continuous constructability knowledge acquisition with fuzzy knowledge-based failure mode and effects analysis |
209 |
IT |
TE2 |
|
| Park, Ji Sang |
Teresa M. Adams, Pisun Sirisuksakulchai |
USA |
Enterprise Modeling of A/E/C firm |
53 |
IT |
TE3 |
|
| Latimer IV, DeWitt T. |
Ogbemi Hammond, Richard Hallon, Christian T Stidsen, Sze-Lok Lam |
USA |
Automatic Detection of Significant Variation from Designed Intent Utilizing Survey Data. CIAMS: Construction information and Management System |
108 |
IT |
TE3 |
|
| Nitta, Yasushi |
Hiroshi Hirashita, Masataka Ebara, Taira Emoto |
Japan |
Study on the overall system architecture of construction equipment support information system |
116 |
IT |
TE3 |
|
| Lee, Ivor Jean-Shiann |
Nie-Jia Yau, Aviad Shapira |
Taiwan |
An integrated system for automatic bridge planning |
167 |
IT |
TE3 |
|
| Liang, Yueh |
Tsai-chu Wang |
Taiwan |
Integrated information systems for highway management |
171 |
IT |
TE3 |
|
| Chen, I-Ming |
Hsi-shang Li, F. M. J. Nickols, Xinggang Yan |
Singapore |
Underwater deployment robots - from amoebot to roboglider |
11 |
Automation |
WA1 |
|
| Cotsaftis, Michel |
Erno Keskinen, Sirpa Launis, Yrjo Raunisto |
Finland |
Feasibility analysis of double-hit hammering for pile foundations |
12 |
Automation |
WA1 |
|
| Fujita, Koichi |
|
Japan |
A Remote Control System in the Pneumatic Caisson Method |
14 |
Automation |
WA1 |
|
| Reusch, Dirk |
|
Germany |
Automatic controlled vibratory pile driving with shock-stress limitation |
88 |
Automation |
WA1 |
|
| Seward, Derek W. |
Stephen Quayle, Norman Mure, Jason Scott |
UK |
On site pile instrumentation and its integration into the management process |
125 |
Automation |
WA1 |
|
| Bock, Thomas |
Jens Herbst, Carlos Balaguer, Mohamed Abderrahim |
Germany |
Design of a Gripping System for the automated assembly of large building modules |
104 |
Automation |
WA2 |
|
| Feng, Chung-Wei |
Shien-Tang Wu |
Taiwan |
Using genetic algorithms to optimize the dispatching schedule of RMC cars |
147 |
Automation |
WA2 |
|
| Guo, Sy-Jye |
Chun-Ta Wu |
Taiwan |
A decision support system for space conflict resolution in building construction |
148 |
Automation |
WA2 |
|
| Wang, Ming-Teh |
Chen-Kang Su |
Taiwan |
Performance evaluation of automation development of construction sector in Taiwan |
195 |
Automation |
WA2 |
|
| Wei, Yen |
Jenn-Chuan Chern |
Taiwan |
The promotion and development of construction automation technology in Taiwan |
223 |
Automation |
WA2 |
|
| Furuya, Noriyuki |
Takashi Shiokawa, Koji Hamada, Kohei Kurita, Isamu Kunimoto, Hiroshi Miyakawa |
Japan |
Present circumstances of an automated construction system for high-rise reinforced concrete buildings |
16 |
Automation |
WB1 |
|
| Harun, Zakaria |
Hamzah Abdul Rahman |
Malaysia |
Cost analysis and formulation of cost models for two-storey buildings construction in Malaysia |
20 |
Automation |
WB1 |
|
| Feldmann, Klaus |
|