Publications / 2000 Proceedings of the 17th ISARC, Taipei, Taiwan
This paper reports on the use of a "Cooperative Ventures" approach to execute a construction project. As demonstrated in this case study, the proposed method is potentially a practical means for project implementation. The effectiveness of this method is examined through a case study in which the project planning and design phases are compared.