The Automation of Construction Scheduling Considering Variability of Working Environment

Peter Makýš
Pages 534-543 (2010 Proceedings of the 27th ISARC, Bratislava, Slovakia, ISBN 978-80-7399-974-2, ISSN 2413-5844)
Abstract:

The duration of building jobs is affected by numbers of different factors what causes that after short period of time schedules, not once, begin to differ from real run of construction. The attainment of stronger stability of the schedules requires to consider variability of factors affecting run of construction within phase of scheduling. This article deals with scheduling methodology which would cover variability of working environment affecting run of construction and possibilities of the automation of scheduling.