Publications / 2013 Proceedings of the 30th ISARC, Montréal, Canada

Development of BIM and Automation Based Total Process for Infra Construction – the State of the Art in Finland

R. Heikkilä, K. Laatunen
Pages 1184-1189 (2013 Proceedings of the 30th ISARC, Montréal, Canada, ISBN 978-1-62993-294-1, ISSN 2413-5844)
Abstract:

A large research and development program called RYM PRE (Process Re-Engineering) has been active in Finland since 2010. As a part of the program, a work packet Infra FINBIM is focused on the development of new national process model, specifications and requirements for the whole Finnish Infra Industry. In the Infra FINBIM, total 15 companies and main owners and 3 research organisations are included. The work is further continuing. The main achieved results up today have been the first specifications and requirements of the BIM based total process for infra sector, about 30 different pilot projects for testing of the new design and construction process models producing a lot of results and observations, a new open information transfer format Inframodel3 based on LandXML standard, the achieved acceptance of the Building SMART organization for support of international development, utilization and extension of the format within the whole infra industry, processes, software and other technical equipment. An evaluation of the results and this work will be drawn.

Keywords: Infra, BIM, Automation, Total Process