Publications / 2009 Proceedings of the 26th ISARC, Austin, USA

Bridge Construction Progress Monitoring Using Image Analysis

Changyoon Kim, Hyoungkwan Kim, Yeonjong Ju
Pages 101-104 (2009 Proceedings of the 26th ISARC, Austin, USA, ISBN 978-0-578-02312-0, ISSN 2413-5844)
Abstract:

Construction progress monitoring is a critical task for construction managers. Traditionally, site superintendents walk the construction site to verify the progress report and understand the current state of construction processes. To get rid of the time consuming process, this research proposes a construction progress monitoring system comprised of a network type closed-circuit television (CCTV) camera, a wireless local area network, and image processing techniques. A civil engineering construction site was selected and the system is able to capture the images of the construction processes. In this paper, the hardware architecture of the system and its initial application results are presented with some promising outcomes.

Keywords: No keywords