Publications / 2018 Proceedings of the 35th ISARC, Berlin, Germany

4D BIM for Improving Plant Turnaround Maintenance Planning and Execution: A Case Study

Wenchi Shou, Jun Wang and Xiangyu Wang
Pages 1191-1198 (2018 Proceedings of the 35th ISARC, Berlin, Germany, ISBN 978-3-00-060855-1, ISSN 2413-5844)
Abstract:

Four-dimensional (4D) Building Information Modelling (BIM) has been credited with improving construction planning procedures. The integration of 3D model with schedule information has enabled the effective detection of design and planning flaws in many construction projects. Due to the lack of research on using 4D BIM in Turnaround Maintenance (TAM) projects, this paper firstly introduce s a novel framework of applying 4D BIM to improve TAM process planning and execution. Then, a real TAM project was selected to validate the effectiveness and efficiency of the proposed framework. Finally, benefits such as time and cost reduction, and safety improvement are calculated and explained.

Keywords: BIM, Turnaround Maintenance, Planning